Equipment Overview

  1. UPS Battery
  2. Cellular Router
  3. 4 or 8-port ATA(s)
  4. 66-block
  5. Cellular Antenna and Cable
  6. Power Cable

Required Tools and Materials

All items below are required for MarketSpark technicians. Self-install customers may only need basic tools for mounting. Please use your judgment based on the scope of work and the install environment.

Tools
  • Laptop
  • Telephone butt set
  • Low voltage tone generator and probe
  • RJ45/11 crimping tool
  • Punch down tool with 66 and 110 blades
  • Label maker
  • Basic hand tool set (screwdrivers, etc.)
  • Screw gun/impact driver (if preferred)
Materials
  • Zip ties/wire consolidation accessories
  • Cross-connect wiring
  • Surface-mount biscuit jacks
  • Cat 5/6 patch cables
  • Screw for use on walls and telco racks
  • RJ45/11 connectors